Primary diamond deposits have been mined on an industrial scale only within the past 150 years, mainly as open pit mines. Although underground mining followed soon after open pits reached technical and/or economic limits, it only gained significant recognition in the past 20 years with the exception of Kimberley Mines. A relatively large number of underground mining methods were tested, implemented, and evolved mainly in South African mines. In the mid-1990s, Alrosa also started the development of the first underground diamond mine in Russia, Internationalnaya. Since then, underground mining has been implemented in several of their mines including Aikhal, Mir, and Udachny. China had also experimented with underground mining at Nhangma 701 Diamond Mine at the end of the nineties, but the largest development of underground diamond mining was experienced in Canada. Today, out of some 50 active diamond mines mining kimberlite or lamproite, approximately 15 are underground and another 15 have underground plans or hold the potential. Ekati Diamond Mine is the first diamond mine to be developed near Lac de Gras in the Northwest Territories of Canada. The Koala North pipe had been developed and mined as an open pit; then later as a mechanised open benching operation to test the underground mining method and to provide access to the lower parts of the Panda and Koala pipes. Both the Panda and Koala pipes were also developed and mined underground once the open pit operations were completed. Koala North, North America’s first underground diamond mining operation, was formally opened in 2002. Three principal underground mining methods: open benching, sublevel caving and incline cave mining were implemented at the Ekati mine. Diavik Diamond Mine started open pit production in 2003. By 2005, underground development had commenced with plans to mine the A154 and A418 pipes using backfill methods. As geotechnical knowledge was gained, the mining methods were re-evaluated and the sublevel retreat (SLR) method was chosen for the A154S and A418 pipes, and blasthole stoping (BHS) with cemented rockfill (CRF) was chosen for the A154N pipe. In 2012, the open pits reached their ultimate depths and Diavik became a fully underground operation. The current mine life is approximately 2025. In 2008, De Beers started underground mining on kimberlite sill at Snap Lake. However, the mine closed in 2015 and it is currently on care and maintenance. The focus of this paper is to document experiences with underground mining of kimberlite pipes at the Ekati and Diavik mines.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.