Abstract

One of the key responsibilities of the RMC batch plant manager is to provide Ready Mixed Concrete (RMC) to construction sites. The manager of the RMC batch plant must create a productive schedule for deploying RMC trucks in order to maximize operations both at the batch plant and on construction sites. The current dispatching schedule is primarily influenced by the preferences of the site and the dispatching manager's past experiences. Check to see if the RMC plant manager sends more and more RMC trucks to the necessary construction site. This may cause a line­up of RMC trucks at one site and keep other sites waiting for RMC truck arrivals, which is referred to as a "interruption." In this research, we try to use evolutionary genetic algorithm optimization to decrease the interruption time. Key words: GA’s applications, Un­interrupted Dispatching, dispatching time of RMC trucks, Optimization of Dispatching schedule.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.