Abstract

Due to the catastrophic consequences of rolling blackouts, there is an increasing concern with the security and stability of modern power grids. Power grid islanding, as an emergency control operation method, can divide power grids into several self-sufficient islands and can then avoid wide-area blackouts. In this paper, we present a two-stage stochastic programming model to divide the power grids into self-sufficient islands before any multiple failures happen, and optimize islanding operations plan under severe multiple contingencies that lead to extreme situations where rolling blackouts may occur. Line switching and controlled load shedding are main tools for islanding, and the expected penalty for load shedding cost is minimized in consideration of contingencies with certain probabilities to happen. The presented model can give the system operator an efficient and optimal way to properly respond to outages. Several numerical experiments are performed on IEEE test cases to show the effectiveness of the proposed islanding operations method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.