Abstract

The input of water into a finite dam is a Wiener process with positive drift. Water may be released at either of two possible rates 0 or M. At any time the output rate can be increased from 0 to M with cost KM, (K ≧ 0), or decreased from M to 0 with zero cost. There is a reward of A monetary units for each unit of output, (A > 0). We will consider the problem of specifying an optimal control output policy under the following optimal criteria: (a)Minimum total long-run average cost per unit time.(b)Minimum expected total discounted cost.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call