Abstract

This paper presents two new multiple-time grid, continuous-time mixed integer linear program (MILP) models for the short-term scheduling of multistage, multiproduct plants featuring equipment units with sequence dependent changeovers. Their main difference results from the explicit consideration of changeover tasks as model variables rather than implicitly through model constraints. The former approach is more versatile in terms of type of objective function that can be efficiently handled (minimization of total cost, total earliness, and makespan), and despite generating larger mathematical problems, it is also a better performer in single stage problems. The latter is better suited for multistage problems, where the former approach has some difficulties even in finding feasible solutions, particularly as the number of stages increases. The performance of both formulations is compared to other MILP and constraint programming models. The results show that multiple-time grid models are better suited for si...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.