Abstract

This paper addresses the problem of scheduling, on a two-machine flow shop, a set of unit-time operations subject to the constraints that some conflicting jobs cannot be scheduled simultaneously on different machines. In the context of our study, these conflicts are modelled by general graphs. The problem of minimising the maximum completion time (makespan) is known to be NP-hard in the strong sense. We propose a mixed-integer linear programming (MILP) model. Then, we develop a branch and bound algorithm based on new lower and upper bound procedures. We further provide a computer simulation to measure the performance of the proposed approaches. The computational results show that the branch and bound algorithm outperforms the MILP model and can solve instances of size up to 20,000 jobs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.