Abstract
This paper develops the methodology, based on the segmentation method, to evaluate the production costs of two interconnected systems. The demand plane is divided into a grid structure, or segments, of equal size. Each segment contains the joint probability of the load in the range of the selected segment as well as the first moments of load, or equivalent load, and residual tie line capacity for each system. The methodology proposed is accurate and computationally efficient. The method is applied to the evaluation of expected energy generation, unserved energy as well as production costs of two interconnected systems. The results also compared to those utiliz Expansion.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.