Abstract

This paper considers the bounded parallel-batching scheduling with two agents to minimize maximum cost of agent A and makespan of agent B simultaneously, in which all jobs of agent A have equal processing time, the jobs from different agents can be processed in a common batch and the cost function of each agent is only determined by its own jobs. In the paper, we present a polynomial-time algorithm to generate all Pareto optimal points for the problem and determine a corresponding Pareto optimal schedule for each Pareto optimal point.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call