Abstract

The efficiency—waste minimization—of a production planning system (PPS), solving the 3-dimensional cutting problem in a crepe rubber mills, has had to be provedSection 1 points out the problem caused by material and production. Section 2 demonstrates an algorithms solving these problems optimally but with comparatively high CPU-time. Section 3 points out how a good heuristic for the same problem works. Section 4 compares the heuristic with the optimal solution. Section 5 compares the presently employed system with the heuristic.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.