Abstract

A laboratory scale membrane bioreactor (MBR) fed on real septic tank effluent was studied at different levels of alkalinity (0, 250 and 500 mg NaHCO3/L addition) and sludge retention time (SRT, complete sludge retention, 10 and 20 days). A long–term operation of 267 days was divided into 5 stages to examine the SRT and alkalinity influences on parameters related to nitrification, chemical oxygen demand (COD) removal, extracellular polymeric substances (EPS) production and membrane cleaning. The results of the study showed that the removals of TCOD, SCOD and NH4+–N varied between 86–94%, 71–86%, and 70–94%, respectively. Appropriate alkalinity supplement and SRT control can enhance the COD removal and nitrification. Irreversible membrane fouling occurred fast and water cleaning for the improvement of filtration capacity was ineffective. The results also revealed that the rejection of EPS played a major role both in the enhancement of removal efficiency as well as the increase of filtration resistance during the operation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.