Abstract

Two-stage aged-refuse bioreactor (ARB) was applied to treat landfill leachate in Shanghai Waste Laogang Disposal Plant. The removal efficiencies of chemical oxygen demand (COD), biological oxygen demand (BOD), total organic carbon (TOC), total nitrogen (TN) and ammonia nitrogen (NH 3–N) of landfill leachate treated by the two-stage bioreactor system were 98.5%, 99.9%, 98.0%, 64.2% and 99.9%, respectively. The COD and BOD in the second stage effluent were 239 and 7 mg l −1, respectively. Thus three types of electrolysis were employed to further treat the second effluent, undivided electrolysis (UDE), divided electrolysis (DE) with Ti/PbO 2 cathode and DE with gas diffusion cathode. All electrolysis processes possessed good color removal effect, while the DE with gas diffusion cathode had the best TOC removal effect. The optimum electrolysis time of leachate was 30 min. The TOC removal efficiencies were 51.4% and 39.7% in anolyte and catholyte, respectively, after 30 min electrolysis at 5 V. In addition, the DE with gas diffusion cathode showed the least energy consumption of 9.8 kWh m −3 at 30 min. The organic pollutants in the leachate were analyzed through a gas chromatography coupled with mass spectrometry (GC–MS) system. Through the two-stage ARB, the species and concentrations of organic pollutants in landfill leachate reduced greatly. Several chlorinated organic compounds were detected in the effluent after the UDE and the anolyte of the DE. In addition, the concentration of absorbable organic halogens (AOX) increased greatly during the electrolysis. Hence, careful consideration should be given in the application of electro-oxidation into the treatment of chloride-containing wastewater.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call