Abstract

Over the past decades, an increasing number of bridges with integral abutment have been built in Switzerland. This type of bridge offers various advantages over standard bridges with abutments, equipped with expansion joints and bearings that require regular inspection and maintenance. One main concern of integral abutment bridges is related to the soil-structure interaction, in particular between the transition slab and the embankment. To avoid any expansion joints, transition slabs are directly connected to the end of integral abutment bridges. They are therefore subject to large displacements of the bridge deck due to temperature effects and creep and shrinkage in concrete bridges. Consequently, detailing of transition slabs needs to be carefully considered. This paper investigates the behaviour of transition slabs, focusing on the settlement of the pavement at the end of the transition slab and on the cracking of the pavement between the bridge deck and transition slab. On that basis, a modified geometry of the transition slab and a new detail for the connection between the bridge deck and the transition slab are proposed. If these propositions are considered at an early stage in the design process, they will result in an improved long term performance of bridges with integral abutments without increasing the construction costs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.