Abstract

A transient multiphase flow model is established by solving the heterogeneous dynamic equation to simulate the process of the slag entrapment in the tundish, which can provide data for the trial production to reduce the tundish residue on the premise of ensuring no slag entrapment. A numerical simulation of critical slag entrapment height of 60 t tundish under different steel throughputs is analyzed, and the following conclusions are obtained: when the steel throughput is 3.5 t/min, 4.5 t/min, 5.5 t/min, and 6.4 t/min, the critical time of the risk of slag entrapment are 1042 s, 691 s, 561 s, and 476 s after casting end, respectively. The heights of slag entrapment are 186.9 mm, 202.9 mm, 220.5 mm, and 222.5 mm, and the heights without slag entrapment are 202.4 mm, 214.6 mm, 236.1 mm, and 238.0 mm with the throughput of 3.5 t/min, 4.5 t/min, 5.5 t/min, and 6.4 t/min.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.