Abstract

ABSTRACT The slag entrapment process under two different initial conditions during the end of casting in tundish is studied. A 3D multiphase mathematical model was developed to simulate the slag entrapment behaviour. The critical slag entrapment time (t s) and the corresponding critical slag entrapment height (h cs) were predicted. The results show the h cs increases, the t s decreases as the casting speed increases, but their relationships are not linear. The influence of casting speed on the h cs in the range of 1.25–1.5 m min−1 is higher than other ranges. The h cs simulated from the steady flow field is higher than that from the static state. When the casting speed is 1.50 m min−1, the difference between the h cs calculated from two different initial conditions is the largest, reaching 9.83 mm (8.42%). The numerical simulation results are verified by a 1:2 scaled water model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.