Abstract

Stability of urban subway systems is a crucial issue in daily operation. This paper proposes a node failing process to test the stability of subway network by structure-based and flow-based node evaluation indicators. Furthermore, three network evaluation indicators are used to measure the network performance. The average transfer number of times (ATT) that is strongly associated with network structure and passenger flow will be discussed specifically. The results show that removing nodes with large inbound passenger flow cannot effectively damage the subway network structure, but it can result in significant increment of the ATT in the whole network. Another finding is that the ATT is smaller in peak hours compared with off-peak hours.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.