Abstract
After the encryption adjustment in the central encryption well area of block A-1, the production in the well area is improved, but at the same time, the production decline of old wells in the well area is accelerated, and water injection is not effective in some oil wells. In order to improve the wells development effect, the adjustment of injection-production system in this well area is analysed in detail, three transfer schemes are designed, the feasibility of different schemes is compared and analysed, it is preferred to select scattered transfer as the best transfer scheme.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.