Abstract

To clarify the traffic flow characteristics and the signal timings at work zones controlled by flaggers, traffic flows at some work zones were measured. Using the measurement data a computer simulation program based on the microscopic traffic flow model was developed. The simulation results were in accordance with the measured results. Using the simulation program traffic behavior was analyzed for various work-zone conditions under the assumption that no heavy vehicles were mixed with the traffic. First, the delay characteristics at short work zones less than 200 m long were investigated. The summed delay of the acceleration delay and the speed-decrease delay was between 35 and 40 percent of the total delay. This suggests that those delays cannot be ignored in estimates of delay at short work zones. Next, three methods for estimating the green intervals under flaggers' control were presented: nomograph, regression equation, and analytical optimization. The first two methods were obtained directly from the...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call