Abstract

In this study, traffic survey was done at signalized intersection of both ends of an upgrading road during morning and afternoon peak hours throughout construction period. The intersections of Tudan Road located at Miri City in Sarawak State, Malaysia were chosen as study sites. The aim of this research was to investigate the traffic condition for the signalized intersections of a R3 secondary road that being upgrading to standard U5 dual carriageway during peak hours for construction and operation stages. Data collected from these sites were analyzed according to Highway Capacity Manual (HCM) 2010. From the results, the level-of-services (LOS) of Kuala Baram By Pass Road intersection improved from Level F to Level E at operation stage for weekday during peak hours in the morning. LOS of Lutong-Kuala Baram Road intersection at construction stage were Level C during peak hours in the morning and Level D during peak hours in the afternoon for weekends. However, the LOS during both peak hours for weekends were projected to improve to Level B at the operation stage. It proved that the road construction has affected LOS, and this temporary issue can be solved after the upgraded road is in operation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call