Abstract

In manufacturing, higher priority is given to hot lots to reduce their cycle time. The impact of hot lots on the cycle time of other lots in the system is studied here. Object-oriented simulation experiments of a wafer fabrication model were run to investigate the above impact. The simulation results showed that as the proportion of hot lots in the work-in progress increases, both the average cycle time and the corresponding standard deviation for all other lots increase dramatically. Thus, it is argued that hot lots induce either a deterioration in service level for regular lots or an increase in inventory costs. Sound management accounting would require that these costs be estimated, possibly using an approach outlined here.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.