Abstract
In this paper, we consider a permutation flowshop scheduling problem with deteriorating jobs. The objective is to minimize the total tardiness of all jobs. A branch-and-bound algorithm incorporating with a dominance property and a lower bound is developed. Furthermore, two metaheuristic algorithms, the simulated annealing algorithm, and the particle swarm optimization method, are proposed. Finally, computational studies are given.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have