Abstract

In modern engineering projects, owners and users pay more attention to the design quality of the electrical system of the project, because a safe and reliable power supply system is one of the decisive factors to determine the perfect realization of the function of the project, the more important the project, the more the need for high-quality power supply design. And the quality of design work of always depends on how designers control details in the process. Therefore, engineers attach more importance to a full-scale quality management in electrical design process. As for the development of quality management system, it has experienced different stages, from the initial quality inspection stage to the statistical quality control stage. And with the continuous progress of social production and advance of science and technology, now total quality management concept is being widely used. The combination of the total quality management and electrical construction drawing design reasonably has become the key path to complete electrical design. This article mainly introduces the reason why the total quality management theory is applied to the electrical construction drawing design of a project in a newly-built nuclear chemical plant. Meanwhile, how four key links of the total quality management are implemented in the electrical design is presented detailedly. The importance of the quality management in the electrical power supply design of the project is expounded as well. In addition, the application of the total quality management in the power supply design and what it will look like in the future are analyzed in this article.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call