Abstract

A random wind speed time history model based on Weibull distribution is constructed. According to the known mean and variance of wind speed, the time fitting curve of random wind speed is obtained through MATLAB simulation method. According to the wind speed range of the actual operation of the wind turbine, the obtained wind speed curve is transformed, and then according to the obtained relationship between the wind speed of the wind turbine and the input torque, the input time-varying torque of the actual operation of the wind turbine is obtained. Establish the rigid shaft model of the wind turbine gearbox, calculate the gearbox transmission ratios at all levels, and then obtain the torque output curves of the gearbox planetary stage, medium-speed stage, and high-speed stage under random wind speed input to study wind power the torque transmission law of the machine drive system. The ability to better analyse the transmission structure of the gearbox and the torque transmission law of key components has a certain significance for the design and manufacture of the wind turbine transmission chain.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.