Abstract
This paper describes the implementation of time-optimal feedback control on a pilot plant evaporator. The time-optimal control for a time invariant linear system is found using an algorithm which is a combination of a Linear Programming scheme and a Gauss- quadrature formula. The execution speed and core storage requirement of the algorithm allows implementation even on a small on-line computer.Experimental results showed that the time-optimal control system was sensitive to process noise and linearisation errors. The influence of process noise was eliminated by the use of a Kalman filter.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.