Abstract

A successful construction project respect the construction time and the estimated costs. Such a smooth construction process ensure effective scheduling. A good time construction plan can be a daunting task for a construction contractor. The article deals with time scheduling of line construction in TILOS software. The result is an analysis of scheduling in this software. The advantages and disadvantages of working of modelling a time-distance graph are described. For better control, it is very advantageous to have a well-processed schedule, which will be to the building model by various logical links connected. Thanks to this compound, it is possible to model the building of construction in the shortest possible time and as smoothly as possible. In conclusion, it is stated, that a well-crafted time construction plan can point to possible construction collisions. An updated time-distance graph processed in a software environment can reveal construction risks and the needed rescheduling in a timely manner. Therefore, it is possible to meet the scheduled construction time and estimated costs.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call