Abstract
In this paper, we present our study of the 22 kV power distribution network at Sisaket substation in Vientiane. Based on the simulation using Digsilent power factory software (DPFS), the protection device, particularly fuses and the reclosers, can be coordinated in time to better protect the system against both temporary and permanent faults, and consequently, the reliability of the system can be improved. Furthermore, the saving fuse and choosing the new protection device to prevent the distribution network is considered in this paper.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.