Abstract

ABSTRACTMethods to design riprap-lined channels usually refer to dumped material. Large blocks placed individually by machinery are used when more stability is required. They offer additional resistance against flow erosion since space between blocks is minimized and interlocking increased. The behaviour of this protection has rarely been studied. An experimental investigation was carried out on the stability of compressed riprap as riverbank protection. Riprap was reproduced by uniform crushed limestones with three block sizes. Tests were conducted for three channel slopes under supercritical flow conditions and for constant bank slope. A time-based analysis allowed establishing relations among time to failure, friction velocity, and dimensionless bed shear stress. The results of 45 tests confirm that the rate of block erosion is significantly reduced with increase in the riprap diameter. The time to failure of the riprap protection depends strongly on the longitudinal slope and on the block sizes. An empirical prediction to estimate the riprap time to failure is shown.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.