Abstract

To complete a project under the complicated situations, it is important to follow effective ways to use available tools and methods, taking into account present technology and management. Also, it is challenging to prepare accurate and achievable plans in large construction projects. Visualizing forms at an early stage in building design improves the ability of designers to deliver ideas and the capability to inspect and assess the methods helps to predict and optimize the actual presentation of the construction project. These different features form the basis for Building Information Modeling (BIM). The archetypal problems like budget overflow, lack of communication, cost overruns, overtime delays, rework can be minimized with the use of Building Information Modeling (BIM) tools for building design & resource management. In this paper, the concept of Building Information Modelling (BIM) is used for 3D modeling, which involves 4th dimension as Time (4D), 5th dimension of Cost (5D) of the project. A case study of G+5 residential apartment is presented for 3D BIM modeling and quantity take-off with the commercial software Autodesk Revit 2019. The 4D BIM carried out using Primavera P6 is explained with methodology for a case study. Further, Autodesk Navisworks Manage 2019 is used for 5D BIM, which includes a graphical presentation of the construction schedule and cost estimation of the case study.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.