Abstract

We consider a semi-online version of the problem of scheduling a sequence of jobs of different lengths on two uniform machines with given speeds 1 and s. Jobs are revealed one by one (the assignment of a job has to be done before the next job is revealed), and the objective is to minimize the makespan. In the considered variant the optimal offline makespan is known in advance. The most studied question for this online-type problem is to determine the optimal competitive ratio, that is, the worst-case ratio of the solution given by an algorithm in comparison to the optimal offline solution. In this paper, we make a further step towards completing the answer to this question by determining the optimal competitive ratio for s between frac{5 + sqrt{241}}{12} approx 1.7103 and sqrt{3} approx 1.7321, one of the intervals that were still open. Namely, we present and analyze a compound algorithm achieving the previously known lower bounds.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.