Abstract

We consider semi on-line scheduling on two uniform machines. The speed of the slow machine is normalized to 1 while the speed of the fast machine is assumed to be s?1. Jobs of size J 1,J 2,? arrive one at a time, and each J i (i?1) has to be assigned to one of the machines before J i+1 arrives. The assignment cannot be changed later. The processing time of the ith job is J i on the slow machine and J i /s on the fast one. The objective is to minimize the makespan. We study both the case where the only information known in advance is the total size ? i?1 J i of the jobs and the case where the only information known in advance is the optimum makespan. For each of these two cases, we almost completely determine the best possible competitive ratio of semi on-line algorithms compared to the off-line optimum, as a function of s in the range $1\le s<\frac{1+\sqrt{17}}{4}\approx1.2808$ , except for a very short subinterval around s=1.08. We also prove that the best competitive ratio achievable for known optimum is at least as good as the one for known sum, even for any number of uniform machines of any speeds.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.