Abstract

Over the past decades, there has been a dramatic increase in the frequency of natural disasters, which are the leading causes of large-scale power outages. This paper, therefore, assesses the significance and role of optimal tie-line construction in improving the service restoration performance of unbalanced power distribution systems in the aftermath of high-impact low-probability incidents. In doing so, a restoration process aware stochastic mixed-integer linear programming model is developed to find the optimal locations for new tie-line construction in unbalanced three-phase distribution systems. In particular, the restoration process of distribution systems, including the fault isolation and system reconfiguration, is contemplated to place tie-lines in the most proper locations to enhance the manoeuvring capability of distribution systems and reducing the customer interruption time. Furthermore, the model is a stochastic one wherein uncertainty associated with potential damages alongside demand uncertainty is captured via a set of likely scenarios. To validate the effectiveness of the proposed stochastic mixed-integer linear programming model, it is tested and verified on the IEEE 13- and 123-bus test systems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.