Abstract
AbstractThe diffusion of offshore wind power plants (OWPPs), useful to fulfil renewable diffusion policy targets, implies several technological challenges for integration in power transmission network. The definition of the OWPP connection to the transmission network affects possible exploitation of the assets, involves an evaluation of active power losses and loadability and points out the need for compensation devices, in order to comply with connection rules fixed by the grid operator. This paper proposes a methodology to determine the most suitable electric connection for an OWPP based on high‐voltage alternating current (HVAC) cables, for providing indications for transmission system operators. In particular, different HVAC connection schemes for OWPPs are analysed, focusing on new 66 kV standard voltage and high‐voltage levels, providing technical insight on transmission cable optimal operation conditions. An economic analysis is carried out by proper estimation of construction costs and production forecast, accounting for active power losses and reliability impact. The most suitable connection solution depending on OWPP size and distance in Italian framework is evaluated by means of synthetic techno‐economic indicators, further analysing possible sensitivities of energy price and capacity factor.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.