Abstract
The performance analysis of a slotted code division multiple access (CDMA) system operating in the outdoor mobile radio environment is presented. The performance is obtained by evaluating the throughput and delay of the system in both macro and micro radio channels. The influence of selection diversity on the performance parameters is studied. The results of the computations of the performance are discussed for various system configurations and different values of the system parameters. The number of resolvable paths and the number of users who share a frequency band are found to have a great effect on the performance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.