Abstract

An analytical model is developed to evaluate the performance of a cellular slotted DS CDMA system in terms of throughput and delay for a multiple cell system. The effect of both imperfect power control and sectorization on the performance is investigated. It is shown that imperfections of the power control and sectorization scheme have a considerable influence on the performance. >

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.