Abstract
An analytical model is developed to evaluate the performance of a cellular slotted DS CDMA system in terms of user capacity, throughput, and delay for the reverse link, i.e., from mobile to base station, considering interference from both home cell and adjacent cells. The user capacity is studied for voice communications and the throughput and delay are inves- tigated for data communications. The effect of both imperfect power control and imperfect sectorization on the performance is investigated. It is shown that the system is rather sensitive to small power control errors and that voice activity monitoring and sectorization are good methods to improve the performance of cellular DS CDMA systems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.