Abstract
Si-rich SiOx and amorphous Si clusters embedded in SiOx films were prepared by the radio-frequency magnetron cosputtering method and high-temperature annealing treatment. The threshold resistance switching behavior was achieved from the memory mode by continuous bias sweeping in all films, which was caused by the formation of clusters due to the local overheating under a large electric field. Besides, the I–V characteristics of the threshold switching showed a dependence on the annealing temperature and the SiOx thickness. In particular, formation and rupture of conduction paths is considered to be the switching mechanism for the 39 nm-SiOx film, while for the 78 nm-SiOx film, adjusting of the Schottky barrier height between insulator and semiconductor is more reasonable. This study demonstrates the importance of investigation of both switching modes in resistance random access memory.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.