Abstract
Abstract A lot of waste heat has not been recycled from exhaust gas of gas-fired condensing boilers. By enhancing boiler’s thermal efficiency, condensation latent and heat sensible heat should be deeply utilized. This article uses a heat pump to recover the waste heat from boiler flue gas to improve the heating efficiency of the unit. Taking an example of boiler unit, to illustrate the function of the thermodynamic capability, this article create a new heating system by installing a flue gas condenser and a low-temperature economizer, and a thermodynamic model. The experimental results show that if gas is cooling from 130°C to90°C and coefficient of performance(Cop ) is set by 1.746, by setting a low-temperature economizer, 20.87MW can be obtained from waste heat, which decrease water consumption of desulfurization tower 28.792t / h; due to that the heat pump use the condenser, waste heat can be recovered to 10.10MW and condensed water can be recovered to13.654t / h. When heat network’s return water increases, Cop decreases, but efficiency will increases in network; when outlet water in condenser increases, Cop and network efficiency decrease, but heat pump system increases in efficiency.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.