Abstract

This paper presents thermodynamic and improvement potential analyses of a helium closed-cycle gas turbine power plant (Oberhausen II) and dominant plant components at four loads. DESIGN LOAD represents optimal operating conditions that cannot be obtained in exploitation but can be used as a guideline for further improvements. In real plant exploitation, the highest plant efficiency is obtained at NOMINAL LOAD (31.27%). Considering all observed components, the regenerator (helium-helium heat exchanger) is the most sensitive to the ambient temperature change. An exact comparison shows that the efficiency decrease of an open-cycle gas turbine power plant during load decrease is approximately two and a half or more times higher in comparison to a closed-cycle gas turbine power plant. Plant improvement potential related to all turbomachines leads to the conclusion that further improvement of the most efficient turbomachine (High Pressure Turbine—HPT) will increase whole plant efficiency more than improvement of any other turbomachine. An increase in the HPT isentropic efficiency of 1% will result in an average increase in whole plant efficiency of more than 0.35% at all loads during plant exploitation. In the final part of this research, it is investigated whether the additional heater involvement in the plant operation results in a satisfactory increase in power plant efficiency. It is concluded that in real exploitation conditions (by assuming a reasonable helium pressure drop of 5% in the additional heater), an additional heating process cannot be an improvement possibility for the Oberhausen II power plant.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call