Abstract

A formulation of the thermal unit commitment problem including nonlinear power flow constraints is presented, making the use of more realistic constraint models possible. It also allows potential VAr production to be used as a criterion for the commitment of generators in strategic locations of the network. The Lagrangian Relaxation framework and a variable duplication technique are employed, permitting exploitation of the separation structure of the dual cost. Some results for small to medium-sized systems are reported.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.