Abstract
This paper shows the results of monitoring the construction of industrial facility using terrestrial laser scanning and BIM. The construction object’s monitoring has been carried out for one year, from the moment of the foundations’ installation beginning to the main supporting building structures installation end. During the monitoring period, the geodetic basis for construction controlled, terrestrial laser scanning controlled, laser scanning data processing controlled, the construction of an executive digital information model controlled and the mounted structures deviations identification from their design solutions were performed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.