Abstract

The tunnel in Liangshui goes through bad geological areas, so it makes the construction work difficult. The overall length of the inclined shaft is 372 meters, and the longitudinal slope is 9.28 downgrade. The surrounding rock deformation appears and the vault subsides, and the joist steel deformation and second lined concrete crack happens too, with serious phenomenon of polenta uplift. The reasons for these phenomena are weakness of supporting structure and stiffness and the function of water as analyzed. In accordance with these phenomena, measures such as adding arch frame, grouting small catheter, steel, anchor and increasing shot concrete strength and increasing thickness, as well as making downstream slope, ditch and sink were taken, so as to make sure of the smoothness of the construction work.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.