Abstract

The construction of the southern part of the ring tunnel and injection beam line is over, and the preparation for the equipment is underway. The construction of the surface technological buildings designed to house the power supply cryogenic, and control systems is in progress. The equipment for UNK-1 is in serial production. All the electromagnetic and vacuum equipment for the 2.7-km-long injection beam line has been manufactured. More than 1000 warm magnets and 11000 m of the vacuum chamber have been supplied, the equipment for the accelerating system and for the power supply system of the ring electromagnet is being manufactured. There is a special 10000-m/sup 2/ building where the equipment is tested and prepared for assembling. >

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.