Abstract

A 3.5 MW gas turbine generator has been added to the BNFL Sellafield standby generation system. This article describes the phases involved in taking a gas turbine from design stage through to installation and final commissioning

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call