Abstract

Remarkable efforts are made to develop the job shop scheduling problem up to now. As a novel generalization, the stage shop can be defined as an environment, in which each job is composed of some stages and each stage may include one operation or more. A stage can be defined a subset of operations of a job, such that these operations can be done in any arbitrary relative order while the stages should be processed in a predetermined order. In other words, the operations of a stage cannot be initiated until all operations of the prior stage are completed. In this paper, an innovative lower bound based on solving the preemptive open shop (using a linear programming model in polynomial time) is devised for the makespan in a stage shop problem. In addition, three metaheuristics, including firefly, harmony search and water wave optimization algorithms are applied to the problem. The results of the algorithms are compared with each other, the proposed lower bound, and a commercial solver.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.