Abstract

This paper considers the uncapacitated lot sizing problem with batch delivery, focusing on the general case of time-dependent batch sizes. We study the complexity of the problem, depending on the other cost parameters, namely the setup cost, the fixed cost per batch, the unit procurement cost and the unit holding cost. We establish that if any one of the cost parameters is allowed to be time-dependent, the problem is NP-hard. On the contrary, if all the cost parameters are stationary, and assuming no unit holding cost, we show that the problem is polynomially solvable in time O(T3), where T denotes the number of periods of the horizon. We also show that, in the case of divisible batch sizes, the problem with time varying setup costs, a stationary fixed cost per batch and no unit procurement nor holding cost can be solved in time O(T3 logT).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.