Abstract

With the formation of electric big data environment, more and more big data analyses emerge. In the complicated data analysis on equipment condition assessment, there exist many join operations, which are time-consuming. In order to save time, the approach of materialized view is usually used. It places part of common and critical join results on external storage and avoids the frequent join operation. In the paper we propose the methods of selecting and placing materialized views to reduce the query time of electric transmission and transformation equipment, and make the profits of service providers maximal. In selection method we design a computation way for the value of non-leaf node based on MVPP structure chart. In placement method we use relevance weights to place the selected materialized views, which help reduce the network transmission time. Our experiments show that the proposed selection and placement methods have a high throughput and good optimization ability of query time for electric transmission and transformation equipment.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.