Abstract
In this paper, the CIM model is used to evaluate and manage the safety risk of subway construction. Taking Nanchang Metro Line 4 bid section 3 as an example, the total safety risk of the project construction is estimated, and the corresponding countermeasures are proposed, which is of certain significance to avoid and respond to the construction project risk. The results show that the possibility of moderate total safety risk in the construction of the third bid section of Nanchang Metro Line 4 is relatively large, and the probability is about 40%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.