Abstract
abstractIn the Netherlands, mineral extraction by means of dredging or quarrying meets with considerable societal resistance. Land surface lowering prior to large land reconstruction projects may raise fewer objections. We have calculated the potential yields of sand and gravel from land surface lowering embedded in planned building and construction projects, and in nature, farmland and recreation area development. Our primary data sets were a compilation of spatial plans for the period 1995 – 2005 and about 95,000 borehole descriptions. Even if embedded consistently, land surface lowering would contribute modestly (up to 5.4 Mio m3/a) to the filling sand provision (annual demand 45 – 50 Mio m3/a).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Netherlands Journal of Geosciences - Geologie en Mijnbouw
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.