Abstract
In this paper it is suggested to change radically the existing metrology paradigm for measurement data analysis, namely to reject from searching the appropriate Distribution Function (DF) and use nonparametric methods for uncertainty estimation in all circumstances. This let to avoid using limiting and unprovable assumptions that lead to invalid conclusions. In the paper it is offered to use Shewhart Control Charts (ShCC) as an indispensable method to monitor the current state of measurement system. And this method does not require any assumptions about specific type of DF.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.