Abstract

The aim of this article is to evaluate the process of terminating the mine water pumping after the liquidation of the Kohinoor II coal mine, situated in the central part of the North Bohemian Brown Coal Basin (NBB) and the subsequent resumption of pumping from the surface after the mine water rise in the area of the former mine to the desired level. We analyzed previously known data, particularly the amount of mine water pumped from the mine area and the surrounding abandoned mines in the past. Further the evaluation of known surrounding abandoned mines aquifer systems, accumulated in the coal seam (underground accumulation of water) and the evaluation of the effect of increasing the water level in the Kohinoor II mine, focusing on the enlargement of the central mine aquifers and the evaluation of the effects of changes in the way of pumping on the surrounding coal seam and its mining with continued safe brown coal mining at the nearby Bílina mine, that can be ensured for at least another 25 years.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call