Abstract

Abstract The research and application of Risk Monitor is one of the most influential analysis tool in the field of probabilistic safety analysis (PSA) of nuclear power plants. Risk Monitor is often used in nuclear power plant operation risk management, scheduled maintenance risk management or other plant activities, aims to help the formulation of power plant integrated decision-making from the risk-informed perspective. The VVER nuclear reactors have four redundant trains to achieve relatively higher safety level, compared to other nuclear power plants design. Because of its four redundant systems design, the configurations of certain system, particularly for the shutdown mode are various. This paper takes the VVER residual heat removal system (JNA) as an example and discusses the method of developing the average PSA model into a risk monitor PSA model for VVER JNA at shutdown mode. Meanwhile, this paper establishes the cases of different JNA setting configurations, aims to support the plant configuration risk management analysis from the perspective of risk level.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.